Keeping up with maintenance and replacements as necessary, the second phase of the Kick Plate Replacement Project will commence this month. If you recall, all upper level kick plates were Replaced in 2011. This time, the wooden trim panels below your entrance doors, if not already replaced by way of work order necessity, will be removed and replaced with Azek, an engineered poly product that will not rot, nor require painting. This work will be done at no inconvenience to you.